Escalator Modernization Case Studies 

 

Albuquerque International Sunport

   
Description: Replaced existing escalators with four KONE EcoMod™ escalators specially designed to fit within the existing trusses. This allowed continuous operation of at least two units, quick and cost-effective replacement and minimal construction debris.
Address: Albuquerque, New Mexico
Year: 2009
Products: KONE EcoMod
 

  Download Case Study »

 

New York City Subway

   
Description: Install 107 heavy-duty escalators, centralize monitoring system with remote access capabilities, and set up peventative support solution.
Address: New York, NY
Year: 2010
Products: KONE Escalators
 

  Download Case Study »

 
 

The Delhi Metro

   
Description: Install 324 elevators and 71 escalators, all with a centralized monitoring system, preventative maintenance solution, and 24/7 service.
Address: Delhi, India
Year: 2010
Products: KONE Escalators and Elevators
 

  Download Case Study »

 

San Diego International Airport

   
Description: Replace five escalators in an airport that serves 15 million passengers per year, while limiting interference with airline passenger traffic.
Address: San Diego, CA
Year: 2009
Products: EcoMod Escalators
 

  Download Case Study »

 

 

Roosevelt Island Subway System

   
Description: Remove and replace eight existing
heavy-duty escalators located underground.
Address: New York, NY
Year: 2008
Products: KONE Transit Escalators
 

Read More »

 

Morgan Post Office

   
Description: Replace 12 escalators – two on each of six floors.
Address: Manhattan, NY
Year: 2008
Products: EcoMod Escalators
 

  Download Case Study »

 

 

George Washington Bridge Bus Station

   
Description: Replace 14 Otis Type R escalators in an essential New York transportation facility.
Address: Upper Manhattan, NY
Year: 2006
Products: EcoMod Escalators
 

  Download Case Study »

 

McCarran International Airport

   
Description: Install four EcoMod escalators in the sixth busiest airport in the world.
Address: Las Vegas, NV
Year: 2006
Products: EcoMod Escalators
 

  Download Case Study »

 

 

Trump Plaza

   
Description: Replace high-traffic escalator equipment in a casino operating 24-7.
Address: Atlantic City, NJ
Year: 2005
Products: EcoMod Escalators
 

  Download Case Study »

 

Moscone Convention Center

   
Description: Update six escalators in one of the
world’s busiest convention centers.
Address: San Francisco, CA
Year: 2004
Products: EcoMod Escalators
 

  Download Case Study »

 
Email
Print
Share
KONE Americas (EN) > References > Escalator Modernization