Other country »
Careers »
Login to MyKONE »
Home
Elevators
Escalator and Autowalk
Maintenance
Modernization
Tools
KONE References
About us
Contact Us
Residential
Q1 Tower
Turning Torso
Millennium Residence
Northpoint
The MET
Office
30 St Mary Axe
FiftyTwoDegrees
Krung Thai Bank HQ - Sukhumvit
Naberezhnaya Tower
Retail & Mixed Developments
King Power Complex
Hotel
Emily Morgan Hotel
Four Seasons Hotel
Swissôtel
The Peninsula Hotel
Public Transportation
Bangkok Mass Transit System
Bejing Capital Airport
GW Bridge Bus Station
Jubilee line, London Underground
McCarran Airport
Schiphol Airport
Suvarnabhumi Airport
Others
National Grand Theatre
Trump Plaza
Walt Disney Concert Hall
Trump Plaza
Description
Replace high-traffic escalator equipment in a casino operating 24-7.
Address
Atlantic City, NJ
Year
2005
Project
Products
KONE EcoMod
All references »
The Challenge
The KONE Solution
The Benefits
Replace old and unreliable equipment.
Allow the casino to remain open.
Maintain an accessible entrance for guests.
Ensure minimal impact on guests.
Keep the structural modifications to a minimum.
EcoMod Drive Controller
Enlarge image »
Pause slide show »
Install two KONE EcoMod escalators.
Provide a solution that does not require closure of the casino.
Keep one escalator running at all times.
Provide a secure work area and a safe entrance for the casino guests.
Install two new escalators without the need for structural modifications.
An
average 90% savings
using EcoMod compared to new construction.
Contact
Contact us »
Downloads
Trump Plaza Case Study (pdf, 121 KB) »
related links
KONE Singapore
>
KONE References
>
Others
>
Trump Plaza