SUMMARY

Challenge

n

To provide a variety of tenants with fluent access to

their offices while guaranteeing efficient access

control in a busy office hub

n

Elevator capacity had to be maximized without

sacrificing an inch of office space

Solution

n

Elevators equipped with a Destination Control System

and integrated PFI solution with access control to

prevent unauthorized entry

• Close collaboration with the architects at a very early

stage of the project to plan the layout of the elevators

inside the building

FAST FACTS

FIRST Rotterdam

n

Completed: 2015

n

Height: 120 m

n

Floors: 30

n

Architect: De Architecten Cie

n

Building owner: KONE

n

Developer: MAB Development

n

Contractor: Boele & van Eesteren

KONE Solutions

n

13 KONE 700 elevators with a

max travel of 115m and 6m/s

3 KONE Turnstile 100 with

KONE Polaris™ DCS and KONE

E-Link integration

n

KONE Polaris™ Destination

Control System with

touchscreens

n

KONE E-Link™ monitoring

system

n

1 hermetic KONE/Markus door

© Ossip Van Diuvenbode