SUMMARY
Challenge
n
To improve and secure the access control to
the building’s private offices
n
To improve the efficiency of people flow and
reduce overall waiting times for elevators
Solution
n
Access control system integrated into the existing
KONE Destination Control System
n
Smart placement of integrated turnstiles to
maximize walking time and reduce the waiting
time at the elevator bank
FAST FACTS
Currency House
n
Completion: 2009
n
Modernized: 2015
n
Complex size: 544,000 ft
2
offices + 25,000 ft
2
retail
n
Building owner: Al Fattan
Properties
n
Architect: DSA Architects
International
n
Contractor: Peremba
Construction SDN BHD
n
Consultant: CKR Consulting
Engineers, LC Consulting, Gensler
KONE Solutions
n
8 KONE MiniSpace™ elevators
n
11 KONE MonoSpace® elevators
n
2 KONE TravelMaster™ 110
escalators
n
KONE Polaris™Destination
Control System.
n
KONE turnstiles
n
KONE Access™ control system
33