SUMMARY
Challenge
■
To install high-performanceelevators ina landmark
buildingwithahighlyunusual tapered shape
■
Todesigna solution compliantwithfire codes
■
Todeliver an eco-efficient solution for a project
with a strong sustainabilityagenda
Solution
■
Customizedhoistingbeams accommodate the
slopingwalls on the top floors of the building
■
KONEworked togetherwith thecontractor todevise
a structural solution compliantwithfire safety codes
■
Regenerativedrives recaptureexcess energy, enabling
it tobe used elsewhere in the buildings
FAST FACTS
The Iceberg
■
Completed: 2013
■
Size: 22,000 sqm
■
Buildingowner: PensionDanmark
■
Architect: CEBRA, JDS,
SeARCH, Louis Paillard
■
Contractor:NCCConstruction
DanmarkA/S
KONESolutions
■
12KONEMonoSpace
®
elevators
©Mikkel Frost