SUMMARY

Challenge

Todeliver an intelligent elevator configuration serving

multipleuser groups

• To integrate the elevator systemwith third-party

access control

• Tomaximizeenergy savings in linewith theEuropean

Commission’s new requirements and LEEDPlatinum

performance

Solution

Adetailed traffic analysis served as a basis for a

flexible elevator, escalator andKONE People Flow

Intelligence solutions configuration

Close collaborationwith the customer and a third-

party access control supplier resulted in smooth

people flow and enhanced security

Energy savings aremaximizedby regenerativedrives,

LED lighting anddestination control

KONESolutions

16KONEMiniSpace

elevators

10KONEMonoSpace

®

elevators

2KONE TranSys

freight

elevators

2KONE EcoMaster

®

130

escalators

Access Control Interfacewith

KONE elevators

KONE Polaris

Destination

Control System

KONE InfoScreen

KONEE-Link

monitoring system

FAST FACTS

DonauCityTower 1

Completed: 2013

Height: 220m

Floors:64

Certification: LEED

Buildingowner:WEDAG

Developer:WEDAG

Architect: Dominique Perrault

Contractor:MaxBögl