SUMMARY
Challenge
■
Todeliver an intelligent elevator configuration serving
multipleuser groups
• To integrate the elevator systemwith third-party
access control
• Tomaximizeenergy savings in linewith theEuropean
Commission’s new requirements and LEEDPlatinum
performance
Solution
■
Adetailed traffic analysis served as a basis for a
flexible elevator, escalator andKONE People Flow
Intelligence solutions configuration
■
Close collaborationwith the customer and a third-
party access control supplier resulted in smooth
people flow and enhanced security
■
Energy savings aremaximizedby regenerativedrives,
LED lighting anddestination control
KONESolutions
■
16KONEMiniSpace
™
elevators
■
10KONEMonoSpace
®
elevators
■
2KONE TranSys
™
freight
elevators
■
2KONE EcoMaster
®
130
escalators
■
Access Control Interfacewith
KONE elevators
■
KONE Polaris
™
Destination
Control System
■
KONE InfoScreen
■
KONEE-Link
™
monitoring system
FAST FACTS
DonauCityTower 1
■
Completed: 2013
■
Height: 220m
■
Floors:64
■
Certification: LEED
■
Buildingowner:WEDAG
■
Developer:WEDAG
■
Architect: Dominique Perrault
■
Contractor:MaxBögl
41