KONE elevator services to shorten construction time in your site 

Construction boosters 

Construction site, London  

Construction Time Elevators

KONE’s Construction Time Elevators (CTU) enable the vertical transportation of people and goods during the construction phase. This will allow earlier completion and will therefore save you money. After completion of your project, KONE CTU elevators are quickly converted into the building’s permanent elevators.

 

Installation method

KONE elevator installation is efficient due to a unique scaffoldless, in-shaft installation system that offers a high level of safety, timesaving, accuracy and flexibility without disruption to other trades.

 

Fitout

KONE provides helpful solutions for the occupation phase of your building by preparing items such as special protection and special control features that serve only the currently occupied floors.

Q1 Tower under construction in Gold Coast Australia  

JumpLift


KONE has developed a self-climbing elevator, the KONE JumpLift, which largely replaces the builder’s exterior hoist. The KONE JumpLift increases the safety of the construction site, improves cost-efficiency and speeds up construction work.

Read more »  

Almas Tower construction site in Dubai UAE  

Trailing deck

Elevator installation technology that speeds up the handover time. It uses a platform below the formwork of the core to install the elevator equipment. Handover of the Construction Time Elevator (CTU) is exceptionally short after the completion of the machine room structure.