Stories from cities

Westend Gate

Westend Gate
KONE arrow

Case overview

 

Across Europe, thousands of buildings are being refurbished and modernized to accommodate more people, support evolving needs, and incorporate modern technology. Frankfurt’s Westend Gate is one such example.

 

Completed between 2015 and 2017, the project included a full elevator modernization and the integration of a range of tailored solutions. The result was a safer, more efficient, and more seamless experience for both hotel guests and office tenants.

 

Project nameWestend Gate
LocationFrankfurt, Germany
Modernization completed2017
Building height159 m
DeveloperRudy Becker & Dörflinger Elektrotechnik

Key considerations of the modernization

  • Minimize disturbance to hotel guests and other occupants
  • Maximize available building space with space-efficient solutions
  • Deliver tailored solutions that address the building's specific requirements

Results of the collaboration

Improving performance with minimal disruption

    hand pressing KONE Destination control system panel

    Improved access and security

    Building entrance doors were refurbished, and KONE Access was integrated with the elevator system to enhance security and improve building-wide efficiency.

    Westend Gate lobby

    Optimized people flow

    KONE's Destination Control system was installed to optimize passenger journeys by directing users to the most efficient elevators, helping reduce congestion during peak traffic periods.

    Elevators in Westend Gate

    Expanded elevator functionality

    Two elevators were extended to reach the underground parking levels, expanding the building's service offering.

    Elevator in Westend Gate

    Improved sustainability

    Eco-efficient modernization solutions were implemented to support the building's sustainability goals and contribute to an improved green rating.

KONE arrow

Technology highlights

  • KONE ReGenerate™ 800 modernization solution
  • KONE Destination control system
  • KONE MonoSpace® 700 elevators
  • KONE Access™

Explore more reference cases

  • Shenzhen Baoan Airport

    An architectural chameleon, Shenzhen Airport’s iconic new terminal nearly triples its capacity, enabling one of the world’s fastest-growing cities to handle up to 45 million air passengers annually.
  • Mariinsky II

    Saint Petersburg makes sound waves with one of the world’s largest and most sophisticated concert halls, the long-awaited Mariinsky II.
  • Capital City

    Moscow’s skyline is seeing a dramatic change. Europe’s tallest building, the 73-story Moscow Tower, has been built as part of the new Moscow International Business Center, or Moscow-City. Employees and residents alike have a prime view of the impressive Russian capital.
  • Leadenhall

    The Leadenhall Building is a building of world firsts. When completed in 2014, it boasted the world’s largest and fastest suite of panoramic elevators. But the real stunner remains the mold-breaking design – nothing comparable had ever been attempted before.