Stories from cities

Westend Gate

Westend Gate
KONE arrow

Case overview

 

Across Europe, thousands of buildings are being refurbished and modernized to accommodate more people, support evolving needs, and incorporate modern technology. Frankfurt’s Westend Gate is one such example.

 

Completed between 2015 and 2017, the project included a full elevator modernization and the integration of a range of tailored solutions. The result was a safer, more efficient, and more seamless experience for both hotel guests and office tenants.

 

Project nameWestend Gate
LocationFrankfurt, Germany
Modernization completed2017
Building height159 m
DeveloperRudy Becker & Dörflinger Elektrotechnik

Key considerations of the modernization

  • Minimize disturbance to hotel guests and other occupants
  • Maximize available building space with space-efficient solutions
  • Deliver tailored solutions that address the building's specific requirements

Results of the collaboration

Improving performance with minimal disruption

    hand pressing KONE Destination control system panel

    Improved access and security

    Building entrance doors were refurbished, and KONE Access was integrated with the elevator system to enhance security and improve building-wide efficiency.

    Westend Gate lobby

    Optimized people flow

    KONE's Destination Control system was installed to optimize passenger journeys by directing users to the most efficient elevators, helping reduce congestion during peak traffic periods.

    Elevators in Westend Gate

    Expanded elevator functionality

    Two elevators were extended to reach the underground parking levels, expanding the building's service offering.

    Elevator in Westend Gate

    Improved sustainability

    Eco-efficient modernization solutions were implemented to support the building's sustainability goals and contribute to an improved green rating.

KONE arrow

Technology highlights

  • KONE ReGenerate™ 800 modernization solution
  • KONE Destination control system
  • KONE MonoSpace® 700 elevators
  • KONE Access™

Explore more reference cases

  • Offsite Escalator Construction at Allegiant Stadium | KONE

    See how KONE assembled and tested 46 escalators offsite to streamline installation and support the construction schedule at Allegiant Stadium.
  • Seattle Children's Hospital

    Discover how KONE helps Seattle Children's Hospital improve elevator safety and reliability with data-driven solutions that support patient care.
  • building

    Optimized solution tailor-made for low-rise properties

    In the hospitality industry, nothing says Welcome! like reliable, dependable elevators. The guest experience at Home2 Suites by Hilton Mesa showcases will help deliver and show the impact of traction technology, energy efficiency and ride quality.
  • Queensbridge Collective

    Charlotte, NC: The Queensbridge Collective, a landmark development in Charlotte's South End, exemplifies modern urban living.