A city on the go

Shanghai is one of the most populous cities in the world and a global financial center. In its rise to becoming a megalopolis, the city is retrofitting old buildings and structures, transforming them into modern office complexes such as the China Plaza 66.

Description

China Plaza 66 is located in the Jing’an District, a prominent commercial area. It hosts numerous Fortune 500 companies and has been setting trends from the time it was built in 2001. However, time has taken its toll and the property has faced stiff competition from newer, more modern office buildings that have been coming up. Which is why its developers decided to upgrade the building. They focused on modernizing the elevator system to reduce operational costs and improve people flow – a feat made all the more challenging by the fact that this was a fully operational building. The KONE team started by surveying the existing equipment and gathering mechanical and electrical information on them. Then, KONE applied a design aesthetics-based solution to this problem, giving the buildings a contemporary look-and-feel while enhancing user experience. While this kept disturbance to tenants and users to a minimum, KONE also used its innovative products to address other challenges, namely increasing energy efficiency and improving people flow. For instance, KONE’s ReGenerate800 solution provided greater reliability and safety as compared with the older elevators, while recovering up to 30% of the energy consumed. Additionally, KONE’s Destination control systems were installed, shortening waiting times, reducing the number of intermediate stops, and increasing handling capacity.

  • #Aasia
  • #Hissit
  • #Liiketilat
  • #Liukuportaat ja -käytävät
  • #Modernization
  • #Ympäristösertifioidut rakennukset

Facts

  • 66 Floors with an area of 159,555 square meters
  • Shanghai Hang Bond Property Development Co. Ltd.

KONE solutions

  • Designed custom-made solution for China Plaza 66 with active inputs from the property owners.
  • Installed innovative technology packages to increase efficiency, reduce costs and upgrade designs.
  • Did much of the work at night to minimize disruption to existing tenants and users.

China Plaza 66

CHALLENGES

  • Upgrade China Plaza 66’s facilities to help it remain competitive in the market.
  • Increase operational efficiency and energy savings of people flow systems.
  • Upgrade interior design features.
  • Carry out all the work without disrupting existing tenants and users.

SOLUTIONS

  • Designed custom-made solution for China Plaza 66 with active inputs from the property owners.
  • Installed innovative technology packages to increase efficiency, reduce costs and upgrade designs.
  • Did much of the work at night to minimize disruption to existing tenants and users.

China Plaza 66

Jaa tämä sivu

Evästeet

Sivustomme käyttää evästeitä, jotta voimme tarjota sinulle parhaan mahdollisen kokemuksen. Hyväksyt evästeiden käytön painaamalla Hyväksyn ja jatkamalla sivujen käyttöä. Voit lukea tietosuojaselosteen täältä.

Would you like to explore our corporate site or visit your local website?

Stay on Corporate site

Would you like to browse the solutions available in your area and the local contact information? Please go to your local website.

Your suggested website is

United States

Siirry paikalliselle sivustolle